PERI UP shoring system used at various heights supporting the slab formwork

7th Heaven - Al Barari Development
Dubai, United Arab Emirates

Part of Al Barari Development

Multipurpose development - recreational facilities

6 buildings / 12 storeys each

Project duration: Q3 2014 - Q2 2017

 

 

Asukoht
Kategooria
Elamud ja mitmekordsed ehitised
Projekti osalejad
Klient: Sustainable Builders

Projekti ülevaade

Rohkem infot projektist
1 /
8
peri-up-al-barari-project
peri-up-al-barari-project
PERI UP Rosett shoring system used for heights up to 14m for cantilever support

Nõuded ja lahendused

Nõuded
different height levels flexible shoring solution adapted to suit all heights easy internal formwork system for forming the shaft

Lahendused
efficient shoring system supporting the slab up to 14 m high easy to remove TRIO panel system after casting the shafts

projetc-director-mustafa-saaid-al-barari-development-peri-formwork-project
projetc-director-mustafa-saaid-al-barari-development-peri-formwork-project
Mustafa Saaid
Project Director
"This project is not a typical project. The requirements for safety and technical solution were high. The technical support and expertise that PERI showed, helped us build this project efficiently and proved to be the right choice for us. I have worked with PERI previously, so when we chose PERI solutions, we trusted the system immediately."

Seotud tooted

Kas töötate sellise projekti kallal?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

7th Heaven - Al Barari Development

PERI UP shoring system used at various heights supporting the slab formwork
PERI UP shoring system used at various heights supporting the slab formwork