Projekti ülevaade
Rohkem infot projektist
Nõuded ja lahendused
![Henrique Santos, Construction manager](https://cdn.peri.cloud/.imaging/lPortrait/dam/ab952f26-7f9c-457f-a3ac-39740f8158ad/83391/henrique-santos-construction-manager.jpg)
![Henrique Santos, Construction manager Henrique Santos, Construction manager](https://cdn.peri.cloud/.imaging/lPortrait/dam/ab952f26-7f9c-457f-a3ac-39740f8158ad/83391/henrique-santos-construction-manager.jpg)
Henrique Santos
Construction manager
In addition to the fast erection, PERI UP offers a high load-bearing capacity. Therefore it was also possible to work on the platforms with heavy material, a crane was not necessary. The scaffolding system was also so flexible that unforeseen adjustments due to inaccurate plans of the structure had no negative impact on the scaffolding solution and the construction sequence.
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location
Cristo Rei Monument, Portugal
![Cristo Rei Monument, Lisbon, Portugal - Work could be safely carried out on the spacious and geometrically adapted working platforms of the PERI UP Rosett scaffold which was erected up to the head of the statue.](https://cdn.peri.cloud/.imaging/mWide/dam/657d46de-b04b-4b41-8f35-39b4f20f3b11/83386/cristo-rei-monument-work-could-be-safely-carried-out.jpg)
![Cristo Rei Monument - Work could be safely carried out Cristo Rei Monument, Lisbon, Portugal - Work could be safely carried out on the spacious and geometrically adapted working platforms of the PERI UP Rosett scaffold which was erected up to the head of the statue.](https://cdn.peri.cloud/.imaging/mWide/dam/657d46de-b04b-4b41-8f35-39b4f20f3b11/83386/cristo-rei-monument-work-could-be-safely-carried-out.jpg)