Projekti ülevaade
Rohkem infot projektist
Nõuded ja lahendused
![Milan Jerábek, Construction Manager](https://cdn.peri.cloud/.imaging/lPortrait/dam/c7776823-3538-4baf-add1-144ca13f429a/82920/milan-jer%C3%A1bek-construction-manager.jpg)
![Milan Jerábek, Construction Manager Milan Jerábek, Construction Manager](https://cdn.peri.cloud/.imaging/lPortrait/dam/c7776823-3538-4baf-add1-144ca13f429a/82920/milan-jer%C3%A1bek-construction-manager.jpg)
Milan Jerábek
Construction Manager
The extremely tight construction time made it necessary to provide the whole formwork in total. PERI offered us a comprehensive solution with the GRV articulated waler formwork, PERI UP Rosett and MULTIPROP. We were able to erect the falsework in a very short time thanks to the PERI supervisor. It was absolutely right to decide in favour of PERI.
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location
Deer crossing bridge Zehun, Czech Republic
![Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.](https://cdn.peri.cloud/.imaging/mWide/dam/c846b042-c323-462b-ac74-f8b6882d13b2/82921/deer-crossing-bridge-zehun-peri-up-rosett-formed-the-falsework-construction-and-was-erected-according-to-the-type-test.jpg)
![Deer crossing bridge Zehun - PERI UP Rosett formed the falsework construction and was erected according to the type test Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.](https://cdn.peri.cloud/.imaging/mWide/dam/c846b042-c323-462b-ac74-f8b6882d13b2/82921/deer-crossing-bridge-zehun-peri-up-rosett-formed-the-falsework-construction-and-was-erected-according-to-the-type-test.jpg)