Projekti ülevaade
Rohkem infot projektist
Nõuded ja lahendused
Nõuded
Two shanks, asymmetrically bent against each other, and growing together structure geometries with different curvatures with constantly changing off-set storeys of the individual elements of the building only two cranes for the whole project
Lahendused
Crane-independent ACS self-climbing solution for the core walls crane-saving, large-area SKYTABLE large slab tables continuous technical and logistics support during the construction time
Lisaväärtus
Construction time of 4 days for a complete storey
Minimum crane times
Optimised work sequences
Horizontal moving of slab tables from a safe position
Tables can also be used for 9 m intermediate storeys
Näita rohkem


Yoon Chul Ahn
Construction manager
We are absolutely satisfied with the PERI systems and the comprehensive service which helped us with proficient engineering, logistics and jobsite support to successfully implement the project. We are able to work safely and with minimum crane utilisation with SKYTABLE and ACS – thus we need less than 4 days for one storey.