Canary Wharf's first high-rise residential building

Hoonete ehitus

Alates ülikoolidest kuni kõrghooneteni – aitame vormida hooneid, mis loovad linna. Vastavalt teie vajadustele töötame välja erinevad raketisesüsteemid mis võimaldavad teil töid teostada ka väga nõudlikus keskkonnas.

Referents projekt

Hoonete ehitus

Maakri kvartal
&lt;b&gt;Kõige paindlikum, mitmekülgsem ja raha säästvam laeraketise süsteem Eestis&lt;/b&gt;<br/><br/>Avatud hoone fassaadi korral, kui ei esine kandvaid välisseinu, kasutatakse laeraketise lahendusena võimalikult palju lavaraketist.<br/>
Sepapaja 1 büroohoone
Ultramodernne ja tõeliselt urbanistlik Ülemiste City ärilinnak areneb suurel kiirusel. 13-korruselisele Öpiku esimesele majale on kerkimas kõrvale ka teine, moodustades seni suurima büroohoonete kompleksi Eestis.
With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper.
Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants.
A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
The PERI CPP climbing protection panel reliably encloses the upper floors under construction.
The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
The RCS climbing protection panel complete encloses the upper floors under construction and provides protection against wind and weather - and increases productivity.
Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building.
The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.
For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.
Habtoor Residences project using PERI ACS Automatic Climbing System
With a height of 220 m, the new office tower of the &quot;Warsaw Spire&quot; building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
The perfectly adapted shoring and working scaffold optimally supplemented the cost-effective formwork solution.
For the construction of the Hotel Meliá in the La Défense office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
Kõige paindlikum, mitmekülgsem ja raha säästvam laeraketise süsteem Eestis. Avatud hoone fassaadi korral, kui ei esine kandvaid välisseinu, kasutatakse laeraketise lahendusena võimalikult palju lavaraketist. Lavaraketis on kasutatav kiireteks valutsükliteks kogu hoone ulatuses.
A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.
Not far from Warsaw‘s city centre, the new headquarters building of the automotive group together with a Mercedes-Benz dealership containing showrooms and a service centre has been realized.
alrimal site Riyadh .
The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
Strong and reliable support up to 14m high with PERI UP shoring system
The challenging building form called for flexibly adaptable formwork and scaffolding systems.
The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
Built to coincide with “Porto 2001 – European Culture Capital”, the concert hall is pictured here after structural work had been completed.
The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.
The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
The complex construction project with highest quality requirements demanded an experienced construction site team as well as on-site support through PERI engineers.
With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
With an X-shaped floor plan, the architectural concept of this building created a new highlight in the urban development of the city of Hradec Králové. Originally, all external surfaces should have received an orange-painted facade. This concept was completely rejected due to the high-quality concrete surface finish.
The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.
With 77 t of PERI UP Rosett materials, the building´s design could be accurately realized as a three-dimensional spatial load-bearing structure.
A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
With the help of the PERI UP Rosett modular scaffold system, 24-metre high shoring was erected at the main entrance of the temple. Even at large heights, up to 40 kN per leg could be safely and reliably transferred.
The execution of this very impressive project required unique engineering and assembly implementation on the construction site.
The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.
With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.
For the reconstruction of the Berlin City Palace, PERI supplied cost-effective formwork and scaffolding solutions from one source. Apart from short shuttering and moving times, the on-site support provided by the PERI engineers in particular ensured that the tight construction schedule could be maintained.
This extraordinary structure is characterized by twisting reinforced concrete walls which reach heights of up to 14 m.
PERI UP scaffolding on the longitudinal sides of the building was designed according to the expected loads and carried the construction loads.
Only when seen from an aerial perspective is the scale of the construction site really apparent: the area is the size of around 2,000 football pitches.
The Midfield Terminal Complex is the ultimate in construction sites: in order to maintain the tight construction schedule, PERI planned and delivered the formwork and scaffolding systems, and has provided yet another convincing performance through the competent engineering service and provision of huge quantities of materials at short notice.
The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
Delivering a high-grade architectural finish for a world-changing university.
The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours
Bold designs and extraordinary architectural concrete fulfilled. In addition, the utmost accuracy was required for the subsequent glazing work
A total of 8,500 m² of exhibition space is now available under the three domes.
Work could be safely carried out on the spacious and geometrically adapted working platforms of the PERI UP Rosett scaffold which was erected up to the head of the statue.
Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
The cantilevered working platform as seen from the visitors platform.
The almost 100 m long Libeskind-designed structure features a 30-metre high wedge tip made of glass and steel.
The LGS Weather Protection Roof on the basis of the PERI UP Scaffolding System made the roof renovation independent of the weather. The 90 m long protection roof consisted of 3 m wide and nearly 30 m long LGS segments.
Accelerated refurbishment project: the customized project solution was based on two compatible PERI modular construction systems – VARIOKIT and PERI UP.
For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.