Newfoundland

Hoonete ehitus

Alates ülikoolidest kuni kõrghooneteni – aitame vormida hooneid, mis loovad linna. Vastavalt teie vajadustele töötame välja erinevad raketisesüsteemid mis võimaldavad teil töid teostada ka väga nõudlikus keskkonnas.

Referents projekt

Hoonete ehitus

Maakri kvartal
Telia büroohoone
Sepapaja 1 büroohoone
Ultramodernne ja tõeliselt urbanistlik Ülemiste City ärilinnak areneb suurel kiirusel. 13-korruselisele Öpiku esimesele majale on kerkimas kõrvale ka teine, moodustades seni suurima büroohoonete kompleksi Eestis.
Trump International Hotel & Tower, Chicago, USA - With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper.
Porta Nuova Garibaldi, Milan, Italy - Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants.
JKG Tower, Jalan Raja Laut, Kuala Lumpur - A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
RONDO 1, Warsaw, Poland - The PERI CPP climbing protection panel reliably encloses the upper floors under construction.
Marina Bay Sands, Singapore - The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
21st Century Tower, Dubai, United Arab Emirates - The RCS climbing protection panel complete encloses the upper floors under construction and provides protection against wind and weather - and increases productivity.
Il Bosco Verticale, Milan, Italy - Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building.
ISET Tower, Yekaterinburg, Russia - The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
Al Hamra Tower, Kuwait City, Kuwait - Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
Evolution Tower, Moscow, Russia - Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
Torre Agbar, Barcelona, Spain - The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.
Cuatro Torres Business Area, Madrid, Spain - For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.
habtoor-residence
Warsaw Spire - With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
Avala TV Tower, Belgrade, Serbia - The perfectly adapted shoring and working scaffold optimally supplemented the cost-effective formwork solution.
Hotel Mélia, La Défense, Paris, France - For the construction of the Hotel Meliá in the "La Défense" office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
Absolute World, Missisauga, Canada - One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
Prosta Tower, Warsaw, Poland - The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
Kõige paindlikum, mitmekülgsem ja raha säästvam laeraketise süsteem Eestis. Avatud hoone fassaadi korral, kui ei esine kandvaid välisseinu, kasutatakse laeraketise lahendusena võimalikult palju lavaraketist. Lavaraketis on kasutatav kiireteks valutsükliteks kogu hoone ulatuses.
Banco de la Ciudad de Buenos Aires - A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
Der neue Zollhof, Düsseldorf, Germany - The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
Galileo Satellite Control Centre, Oberpfaffenhofen, Germany - The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.
DaimlerChrysler Subsidiary Warsaw, Poland - Not far from Warsaw‘s city centre, the new headquarters building of the automotive group together with a Mercedes-Benz dealership containing showrooms and a service centre has been realized.
alrimal site Riyadh .
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
ADAC Headquarters, Munich, Germany - For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
PERI UP shoring system used at various heights supporting the slab formwork
Federal Chancellery Berlin - The challenging building form called for flexibly adaptable formwork and scaffolding systems.
Hotel Capella, Sentosa Island, Singapore - The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
Potsdamer Platz, Berlin, Germany - The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
Casa da Música, Porto, Portugal - Built to coincide with “Porto 2001 – European Culture Capital”, the concert hall is pictured here after structural work had been completed.
Parco della Musica e della Cultura, Florence, Italy - The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
National stadium Kazimierz Górski, Warsaw, Poland - The complex construction project with highest quality requirements demanded an experienced construction site team as well as on-site support through PERI engineers.
UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
Hradec Králové Library, Czech Republic - With an X-shaped floor plan, the architectural concept of this building created a new highlight in the urban development of the city of Hradec Králové. Originally, all external surfaces should have received an orange-painted facade. This concept was completely rejected due to the high-quality concrete surface finish.
Sports arena Lora, Split, Croatia - The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.
Restaurante Florante Submarino, Valencia, Spain - With 77 t of PERI UP Rosett materials, the building´s design could be accurately realized as a three-dimensional spatial load-bearing structure.
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
Temple of Divine Providence, Warsaw, Poland - With the help of the PERI UP Rosett modular scaffold system, 24-metre high shoring was erected at the main entrance of the temple. Even at large heights, up to 40 kN per leg could be safely and reliably transferred.
Mercedes-Benz Museum, Stuttgart, Germany - The execution of this very impressive project required unique engineering and assembly implementation on the construction site.
Centre Pompidou, Metz, France - The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.
St. Martins Therme & Lodge, Frauenkirchen, Austria - With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.
Overview of the construction site - PERI Project - "Humboldt Forum" City Palace, Berlin
MAXXI - Museo nazionale delle arti del XXI secolo, Rome, Italy - This extraordinary structure is characterized by twisting reinforced concrete walls which reach heights of up to 14 m.
The Squaire, Frankfurt am Main, Germany - PERI UP scaffolding on the longitudinal sides of the building was designed according to the expected loads and carried the construction loads.
BBI Airport, Berlin Brandenburg, Germany - Only when seen from an aerial perspective is the scale of the construction site really apparent: the area is the size of around 2,000 football pitches.
Midfield Terminal Building, Abu Dhabi - The Midfield Terminal Complex is the ultimate in construction sites.
Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
Delivering a high-grade architectural finish for a world-changing university.
PERI UP - the versatile scaffolding system aids a hospital build in Belfast
The solution by PERI is realised in the finish of the concrete walls for the Aquatics Centre for London 2012
Maritime museum Tallinn, Estonia - A total of 8,500 m² of exhibition space is now available under the three domes.
Cristo Rei Monument, Lisbon, Portugal - Work could be safely carried out on the spacious and geometrically adapted working platforms of the PERI UP Rosett scaffold which was erected up to the head of the statue.
Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
Karlskirche Church Vienna, Austria - The cantilevered working platform as seen from the visitors platform.
Museum of military history, Dresden, Germany - The almost 100 m long Libeskind-designed structure features a 30-metre high wedge tip made of glass and steel.
LGS Weather Protection Roof from PERI, the lattice girder system for weather protection, rain protection, snow protection, hail protection.
Unusual Scaffolding solution: Cantilevered instead of positioning. New engineered working scaffold solution.
Bridge renovation Ponte Rio Tua, Vila Real, Portugal - For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.