Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.

Puente Baluarte
Baluarte, Mexico

Construction of 2 lozenged (diamond-shaped) bridge pylons for a cable-stayed bridge. Construction of 9 double piers, braced via solid crossbars.
At the time of construction, the Puente Baluarte is the third highest bridge in the world.

Height bridge pylons: 169 m and 156 m

Height double piers: max. 145 m

Total length of bridge: 1,124 m

Span of main bay: 520 m

Width of bridge superstructure: 20 m

Depth of the canyon to be spanned: ca. 400 m

Construction period until completion: 2008 - 2012

 

 

Asukoht
Kategooria
Tellingute projektid
Projekti osalejad
Klient: TRADECO Infraestructura, S.A. de C.V.

Projekti ülevaade

Rohkem infot projektist
Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.
Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.
Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.

Nõuded ja lahendused

Nõuded
Fabrication of the two pylons and the foreland double piers complex construction geometry of the two pylons forwards and backwards inclined outer walls

Lahendused
Detailed cycle planning for formwork and scaffolding for every pouring section material provision for 2 pylons self-climbing solution adjustable to various concreting heights as well as forwards and backwards inclined outer walls support on the spot at the jobsite by experienced PERI supervisor shoring solution for shuttering of crossbars

Lisaväärtus
Optimised material provision through multiple utilisation for the lower and upper pylon section
Savings concerning crane times
Fast adjustment to building geometry during every pouring section
Fast construction progress due to large-size climbing units
Safe working platforms
Excellent concrete surfaces

Näita rohkem
Puente Baluarte - Salvador Sánchez Núñez, Project Manager
Puente Baluarte - Salvador Sánchez Núñez, Project Manager
Salvador Sánchez Núñez
Project leader
We are extremely satisfied with the PERI systems and the efficient engineering – we were able to considerably accelerate the climbing cycles thanks to ACS. Despite the great height, we were able to work safely on the working platforms. Furthermore, we achieved excellent concrete surfaces, our customer is very satisfied.

Seotud tooted

    Kas olete huvitatud PERI abist teie järgmisel projektil?

    Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

    Location

    Puente Baluarte, Mexico

    Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.
    Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.