Nõuded
Fabrication of the two pylons and the foreland double piers complex construction geometry of the two pylons forwards and backwards inclined outer walls
Lahendused
Detailed cycle planning for formwork and scaffolding for every pouring section material provision for 2 pylons self-climbing solution adjustable to various concreting heights as well as forwards and backwards inclined outer walls support on the spot at the jobsite by experienced PERI supervisor shoring solution for shuttering of crossbars
Lisaväärtus
Optimised material provision through multiple utilisation for the lower and upper pylon section
Savings concerning crane times
Fast adjustment to building geometry during every pouring section
Fast construction progress due to large-size climbing units
Safe working platforms
Excellent concrete surfaces
Näita rohkem


Salvador Sánchez Núñez
Project leader
We are extremely satisfied with the PERI systems and the efficient engineering – we were able to considerably accelerate the climbing cycles thanks to ACS. Despite the great height, we were able to work safely on the working platforms. Furthermore, we achieved excellent concrete surfaces, our customer is very satisfied.
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location