Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.

Traffic junction Czerniakowska
Warsaw, Poland

Length/height viaduct CE-2: 430 m / 11.90 m

Length/height viaduct CE-3: 600 m / 14.60 m

Structure: superstructure as pre-stressed hollow box

 

 

Asukoht
Kategooria
Tellingute projektid
Projekti osalejad
Klient: Consortium DROMEX S.A. - Mostostal Warszawa S.A. / WARBUD S.A. / KPRM SKANSKA S.A.

Projekti ülevaade

Rohkem infot projektist

Nõuded ja lahendused

Default Person
Default Person
Sławomir Ramski | Piotr Kolasa
Construction Manager KPRM | Construction Manager WARBUD
PERI has supplied a perfect solution for bypassing the road with its ongoing traffic. You can completely rely on PERI, 100% – and if necessary, the PERI specialists even come to the jobsite at night or on Sundays and bank holidays.

Seotud tooted

Kas olete huvitatud PERI abist teie järgmisel projektil?

Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee

Location

Traffic junction Siekierkowska roadway, Poland

Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.
Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.