Sławomir Ramski | Piotr Kolasa
Construction Manager KPRM | Construction Manager WARBUD
PERI has supplied a perfect solution for bypassing the road with its ongoing traffic. You can completely rely on PERI, 100% – and if necessary, the PERI specialists even come to the jobsite at night or on Sundays and bank holidays.
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location
Traffic junction Siekierkowska roadway, Poland
![Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.](https://cdn.peri.cloud/.imaging/mWide/dam/08d4af16-a342-4269-abf3-a268fa8da094/82918/traffic-junction-czerniakowska-pre-stressed-hollow-box-superstructure-was-formed-with-vario-gt-24-wall-formwork-and-multiflex-slab-formwork.jpg)
![Traffic junction Czerniakowska - pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.](https://cdn.peri.cloud/.imaging/mWide/dam/08d4af16-a342-4269-abf3-a268fa8da094/82918/traffic-junction-czerniakowska-pre-stressed-hollow-box-superstructure-was-formed-with-vario-gt-24-wall-formwork-and-multiflex-slab-formwork.jpg)