Projekti ülevaade
Rohkem infot projektist
Nõuded ja lahendused
Thorsten Wahner
Site Manager and General Manager
The LGS installation using ridge clasp and roles is absolutely convincing. In addition, PERI engineers demonstrated speed in their planning skills - size, planning, statics and assembly had to be adhered to a tight schedule.
Kas olete huvitatud PERI abist teie järgmisel projektil?
Helista numbrile +372 677 11 00 või kirjuta e-mailile peri@peri.ee
Location